Electrical Load Study Los Angeles
Need to confirm electrical capacity before EV chargers, a panel upgrade, tenant improvement, or LADBS permit submittal? Shaffer Construction performs Los Angeles electrical load studies for commercial buildings, multifamily properties, and EV charging projects, with documentation for utility planning, permit review, budgeting, and safe design.
Capacity answers before you commit
Need a load study before EV chargers, permits, or a service upgrade?
If you are adding EV chargers, upgrading equipment, building out a tenant space, or responding to plan check comments, a load study gives you the capacity data needed before drawings, equipment orders, utility requests, or construction decisions.
EV charger capacity
See how many Level 2 or DC fast chargers the existing service can support before equipment is purchased.
Commercial building loads
Measure actual demand for tenant improvements, equipment additions, HVAC changes, and facility upgrades.
Permit documentation
Use capacity data for LADBS permit review, utility planning, engineer coordination, and project budgeting.
Upgrade decisions
Know whether load management, panel work, service upgrades, or phased installation makes the most sense.
EV Charger Capacity Planning
Find out how many Level 2 or DC fast chargers your existing service can support before equipment is purchased or trenching begins. We identify available capacity, load management options, utility constraints, and the likely electrical upgrade path for commercial EV charging projects.
Real Electrical Usage Data
A load study gives you real demand data instead of guesses from panel schedules alone. We review voltage, current, power factor, peak demand, phase balance, and existing load patterns so project decisions are based on measured electrical behavior.
Permit and Utility Documentation
We prepare documentation that supports LADBS permits, utility coordination, EV charging design, panel upgrade planning, and internal budgeting. Stamped reports are available when the project requires engineering review.
Capacity and Code Compliance
We verify available capacity for new equipment, check NEC requirements, flag overloaded or unbalanced conditions, and provide practical next steps. The result is a clearer decision on whether to proceed, add load management, or plan an electrical upgrade.
| Study Type | Duration | Deliverables |
|---|---|---|
| Panel Load Study | 7 to 14 days | Capacity report and recommendations |
| EV Charging Study | 14 to 21 days | Load analysis and utility coordination |
| Service Entrance Study | 21 to 30 days | Facility analysis and upgrade plan |
| Power Quality Study | 7 to 30 days | Harmonic analysis and corrective options |
Critical Data for Critical Decisions
Comprehensive Load Study Services
Electrical Load Study Reports for Permits, EV Chargers, and Commercial Building Capacity
Load Study Planning Guides
Planning cost, permits, EV charger capacity, or a panel upgrade before you call? Start with our electrical load study cost guide, then review when a Los Angeles property needs a load study, EV charger load studies for businesses, and load studies for EV chargers and panel upgrades.
These guides help owners decide whether the next step is monitoring, load management, a panel upgrade, a service increase, or a construction estimate. If you already have photos, plans, charger cutsheets, or utility notes, send them with the site address so we can price the right scope.
Ready to Get Started?
Contact us today for a consultation!
Contact Us